Full plumbing rough-in & fit-off for a 5-storey apartment build
Complete hydraulic rough-in, stack and fit-off across a five-storey apartment development — sequenced tightly to the builder's program.
Client
SA commercial builder
Location
Inner Adelaide, SA
Completed
2024
Scope of work
Hydraulic rough-in
Sanitary & stormwater stacks
Water services & metering
Fixture fit-off
By the numbers
What the job delivered
5
Storeys plumbed
40+
Apartments fitted off
On
Program, every level
0
Defects at handover
The challenge
A five-storey, multi-unit apartment build needed its complete hydraulic package delivered on a tight construction program, with every trade stacked on top of each other and no room for slippage between levels.
What we did
Working from the hydraulic drawings, our construction crew delivered the full rough-in — sanitary and stormwater stacks, water services and metering — level by level, then returned for a clean fixture fit-off, coordinating closely with the site foreman at every pour and lock-up.
Set-out and rough-in coordinated to the builder's floor-by-floor program
Sanitary, stormwater and water service stacks installed ahead of each slab pour
Progressive inspections and hydrostatic testing at every stage
Fixture fit-off and commissioning ahead of practical completion
On site
The outcome
The hydraulic package was delivered on program and defect-free at handover, keeping the builder's overall schedule on track through to practical completion.
“They kept pace with our program floor by floor and handed over without a defect list. That's exactly what you want from a hydraulic contractor.”
From live-site upgrades to full new-build hydraulic packages, Hall & Baum deliver compliant commercial plumbing on schedule. Let’s talk about your job.