Commercial Retail & Hospitality

No-dig drainage rectification for a busy shopping centre

No-dig relining of a food-court grease line that kept every trader open through peak trade — no excavation, no shutdowns.

Client
Adelaide shopping centre
Location
Adelaide metro, SA
Completed
2023

Scope of work

  • CCTV inspection
  • Pipe relining
  • Grease arrestor servicing
  • Preventative maintenance

By the numbers

What the job delivered

0
Tenancies closed
1
Overnight reline, no excavation
12mo
Blockage-free since works
PPM
Ongoing schedule in place

The challenge

Recurring blockages in a food-court grease line were forcing tenancy shutdowns during peak trade and creating a real health-inspection risk. Excavating through a live, tiled food court during trading hours was out of the question.

What we did

A CCTV inspection located root ingress and collapsed sections in the main. We relined the pipe using a no-dig cured-in-place liner overnight and brought the grease arrestor servicing onto a managed schedule — all without lifting a single floor tile.

  1. Overnight CCTV survey to map the failure without disrupting traders
  2. No-dig cured-in-place pipe relining of the affected main
  3. Grease arrestor cleaned, serviced and placed on a PPM schedule
  4. Post-works camera footage handed over as proof of rectification

On site

Hall & Baum plumber completing a emergency plumbing job in Adelaide
Why your hot water runs out so fast (and what to do about it)

The outcome

Traders never lost a day of business, the health risk was removed, and the centre now runs a preventative maintenance schedule that has kept the line clear ever since.

“They fixed it overnight without touching the floor and we opened on time the next morning. No fuss, no mess, no closed shops.”
Centre Manager — Retail shopping centre